J. For. Sci., 2013, 59(7):261-266 | DOI: 10.17221/19/2013-JFS

Productivity and cost analysis of skidding with Timberjack 450C in forest plantations in Shafaroud watershed, IranOriginal Paper

M. Nikooy, A. Esmailnezhad, R. Naghdi
Department of Forestry, Faculty of Natural Resources, The University of Guilan, Somehsara, Iran

We present research results of timber skidding by a Timberjack 450C skidder in the path cutting of pine trees in Shafaroud watershed. Time studies were conducted to quantify the productivity and perational cost of skidding by a skidder in a plantation in even terrain conditions in Shafaroud, northern Iran. A linear regression model was applied for finding the relation of dependent variables such as total time consumption and productivity with appropriate independent variables. The most influencing variable for skidding were skidding distance, number of logs in each turn and load volume. The results indicated that the total production with and without delays was 5.17 and 5.98 m3.effective h-1, while the production cost with and without delays was 13.7 and 11.91 USD.h-1, respectively.

Keywords: forest operation; wood extraction; skidder; time study; Iran

Published: July 31, 2013  Show citation

ACS AIP APA ASA Harvard Chicago Chicago Notes IEEE ISO690 MLA NLM Turabian Vancouver
Nikooy M, Esmailnezhad A, Naghdi R. Productivity and cost analysis of skidding with Timberjack 450C in forest plantations in Shafaroud watershed, Iran. J. For. Sci. 2013;59(7):261-266. doi: 10.17221/19/2013-JFS.
Download citation

References

  1. Abeli W.S. (1992): Optimal road spacing for manual skidding sulkies. Journal of Tropical Forest Science, 6: 8-15.
  2. Behjou F.K., Majnounian B., Namiranian M., Dvořák J. (2008): Time study and skidding capacity of the wheeled skidder Timberjack 450C in Caspian forests. Journal of Forest Science, 54: 183-188. Go to original source...
  3. Conway S. (1984): Logging Practices. San Francisco, Miller Freeman Publication: 416.
  4. Ershadifar M., Nikooy M., Naghdi R. (2011): Ability assessment of felling crew in directional felling in west forest of Guilan province. Iranian Journal of Forest, 3: 169-176. (in Persian)
  5. Feghhi J. (1989): Evaluation of Two Mechanized Harvesting Systems in Shafaroud. [MSc Thesis.] Tehran, Tehran University: 158. (in Persian)
  6. Iranian Forest, Range and Watershed Organization (IFRWO) (2006): Instructions for Planning of Landing and Skid Trail. Tehran, Forest Harvesting Office: 35.
  7. Jourgholami M. (2005): Study of Efficiency, Production and Cost of Large and Small Skidders (Case Study of TAF and Optimum Road Spacing of Ground Based 112 Skidding Operations Timberjack 450C). [MSc Thesis.] Tehran, Tehran University: 94. (in Persian)
  8. Jourgholami M., Majnounian B. (2008): Productivity and cost of wheeled skidder in Hyrcanian forest. International Journal of Natural and Engineering Sciences, 2: 99-103.
  9. Kluender R., Lortz D., McCoy W., Stokes B., Klepac J. (1997): Productivity of rubber-tired skidders in southern pine forests. Forest Product Journal. 47: 53-58.
  10. Miller D.E., Straka T.J., StokesB.J., Watson W.F. (1987): Productivity and cost of conventional understory biomass harvesting. Forest Products Journal, 37: 39-43.
  11. Mousavi R., Nikooy M., Uusitalo U. (2011): Time consumption, productivity, and cost analysis of the motor manual tree felling and processing in the Hyrcanian Forest in Iran. Journal of Forest Science, 58: 79-87. Go to original source...
  12. Mousavi R., Nikooy M., Esmailnezhad A., Ershadifar M. (2012): Evaluation of full tree skidding by HSM-904 skidder in patch cutting of aspen plantation in Northern Iran. Journal of Forest Science, 58: 79-87. Go to original source...
  13. Naghdi R. (2005): Investigation and Comparison of Two Harvesting Systems: Tree Length and Cut-To-Length Method in Order to Optimize Road Network Planning in Neka, Iran. [Ph.D. Thesis.] Tehran, Tarbiat Modares University: 177. (in Persian)
  14. Najafi A., Sobhani H., Saeed A., Makdom M., MarviMohjer M.R. (2007): Time study of Skidder HSM 904. Journal of the Iranian Natural Resources, 60: 921-930.
  15. Nikooy M. (2007): Production Optimization and Reduction Impact on Forest by Preparing Harvest Planning in Nav, Iran. [Ph.D. Thesis.] Tehran, Tehran University: 165. (in Persian)
  16. Pilevar B. (1996): Calculation of Cost in Two Harvesting System: Cable Crane and Ground Skidding. [MSc Thesis.] Tehran, Tehran University: 98. (in Persian)
  17. Pir Bavaghar M.P., Sobhani H., Feghhi J., Darvishsefat A.A., MarviMohajer M.R. (2010): Comprehensive productivity models for tracked and wheeled skidders in the Hyrcanian forests of Iran. Research Journal of Forestry, 4: 65-71. Go to original source...
  18. Shafaroud (2012): Northern forest. Available at http://www.shafaroud.com (in Persian)
  19. Spinelli R., Hartsough B.R. (2001): Extracting whole short rotation trees with a skidder and a front-end loader. Biomass and Bioenergy, 21: 425-431. Go to original source...
  20. Wang J., Long C., McNeel J., Baumgras J. (2004): Productivity and cost of manual felling and cable skidding in central Appalachian hardwood forests. Forest Product Journal, 54: 45-51.

This is an open access article distributed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International (CC BY NC 4.0), which permits non-comercial use, distribution, and reproduction in any medium, provided the original publication is properly cited. No use, distribution or reproduction is permitted which does not comply with these terms.